Fire Safety and Emergency Preparedness Checklist
Fire Safety Equipment Inspection
Walk every work cell, aisle, and welding bay. Travel distance to the nearest extinguisher must not exceed 75 ft for Class A or 50 ft for Class B per NFPA 10. Flag any unit blocked by pallets, totes, or seasonal staging — that's the most common citation finding.
Confirm each extinguisher has a current monthly visual tag and an annual maintenance tag from a licensed servicer. Verify gauge in the green, pin and seal intact, no corrosion or damage to the cylinder. 6-year teardown and 12-year hydrostatic test dates should be on the collar.
Red-tag any unit that failed inspection or is past due, remove it from the wall, and stage in the maintenance crib. Place a temporary replacement at the same coverage point so travel distance stays compliant. Open a CMMS work order to recharge or replace before closing this step.
Coordinate with the monitoring company before testing so dispatch isn't triggered. Verify panel is in normal status, exercise a sample of pull stations, smoke detectors, and horn/strobes per NFPA 72 ITM. Capture the test report from the licensed contractor.
Run the 30-second monthly test on every battery-backed exit sign and emergency luminaire, and the 90-minute annual discharge test required by NFPA 101. Replace any unit that won't hold the full duration — failed batteries are the typical finding.
Pull the contractor's most recent NFPA 25 ITM report and confirm gauges, control valves, and FDC are documented. Check the 18-inch clearance below sprinkler heads in racking and storage areas — high-piled storage encroachment voids the design.
Emergency Evacuation Plan
Required elements: evacuation procedures and routes, procedures for employees who remain to operate critical equipment, accounting for personnel after evacuation, rescue and medical duties, and the means of reporting fires. Update names and phone numbers if turnover happened this year.
Post current floor diagrams at every primary egress, break room, and time clock — with a 'You Are Here' marker, the primary and secondary route, and the muster point. Verify Spanish or other shop-floor language versions match.
One warden per shift per zone — assembly, machining, finishing, warehouse, office. Wardens sweep their zone, confirm bathrooms and break rooms are empty, and report headcount at the muster point. Cover backup wardens for vacation and second shift.
Run on a normal production shift, not a quiet day. Time from alarm activation to muster headcount complete; benchmark is under 5 minutes for typical shop floors. Watch for common failures: forklift drivers staying with their truck, machine operators trying to finish a cycle, contractors not joining the muster.
Open a CAR for each deficiency: blocked egress, missed muster, slow response, headcount mismatch. Assign owner, due date, and effectiveness check (verify on the next drill). File with the EAP record.
Employee Safety Training
Cover the EAP, alarm and notification, evacuation routes by zone, and the incipient-vs-defensive decision: per 29 CFR 1910.157, employees expected to use extinguishers must be trained at hire and annually thereafter. Otherwise the policy is total evacuation.
Use a propane training prop or licensed third-party trainer in the parking lot. Each operator practices Pull-Aim-Squeeze-Sweep on a live fire. Classroom-only training does not satisfy 1910.157(g)(3) for designated responders.
Cover the hot work permit process (welding, cutting, grinding within 35 ft of combustibles), 30-minute fire watch after work ends, and dust hazards specific to your process — wood, aluminum, sugar, plastics resin. Dust deflagration starts when accumulation exceeds 1/32".
Day-1 orientation covers alarm sound, primary and secondary routes from their work area, muster point, and warden for their shift. Required before unsupervised floor access — not a check-the-box at the end of the first week.
Sign-in sheets, quiz scores, and acknowledgment forms. OSHA expects records on demand; most QMS and LMS systems retain these. Three-year retention minimum, longer if your QMS or insurer requires.
Hazardous Materials Management
Class I-II liquids in FM-approved or UL-listed cabinets; max 60 gallons per cabinet, max 3 cabinets per control area. Verify self-closing doors latch, vent bungs are sealed (or vented to safe location), and grounding/bonding for dispensing.
Primary containers carry the GHS pictogram, signal word, hazard and precautionary statements. Secondary containers (squeeze bottles, parts-washer reservoirs) need at minimum the product identifier and GHS hazard info. Confirm NFPA 704 placards on bulk storage match the SDS.
Check capture velocity at parts washers, paint booths, and weld stations. Replace booth filters before they bleed through; loaded filters are an ignition path. Confirm any local exhaust interlocks haven't been bypassed by a maintenance tech.
Match kit contents to chemicals used — universal absorbent, oil-only, hazmat. Confirm placement near dispensing points, not just at the EHS office. Train on the incidental-vs-emergency line per 1910.120; emergency releases require HazWoper-trained responders.
Walk every storage area against the chemical list. Note new products added without an SDS, products that exceed Tier II reporting thresholds, and quantities that push you into the next RCRA generator status (VSQG → SQG → LQG).
For each new product, file the manufacturer's SDS in the binder and the digital archive. Deliver targeted training to affected operators before first use — not at the next annual refresher. Update Tier II and TRI tracking if thresholds shifted.
Facility Maintenance and Housekeeping
Walk each cell with the supervisor: cardboard, oily rags, pallet stacks, and packaging waste are the typical fuel loads. Oily rags belong in self-closing FM-approved cans; loose accumulation has caused multiple spontaneous-combustion fires in metal-finishing shops.
Verify 36-inch clearance in front of panels (NFPA 70E), no daisy-chained power strips, no extension cords used as permanent wiring. Note any heat discoloration on breakers or warm-touch panels for thermography follow-up. Capture findings as a paragraph for the corrective-action log.
Pull the CMMS PM history for compressors, hydraulic power units, dust collectors, and ovens. Bearings, motors, and belt-driven equipment are common ignition sources when PMs slip. Flag any deferred PM older than 30 days for plant manager review.
Inspect overhead horizontal surfaces — beams, ducts, light fixtures, cable trays. Accumulation greater than 1/32" over 5% of the floor area meets the NFPA threshold for a deflagration hazard. Use HEPA vacuums rated for the dust class; compressed air blow-down disperses dust into a cloud and is the wrong tool.
28-inch minimum aisle width to every exit. Walk both shifts — first shift parks pallets in second shift's egress all the time. Verify exit doors open with a single motion, no padlocks or chains during occupied hours, and panic hardware functions.
Use this template in Manifestly
- Manufacturing Employee Training Checklist
- Supplier Evaluation Checklist
- Sustainability Practices Checklist
- Manufacturing Regulatory Compliance Checklist
- Manufacturing Waste Management Program
- Production Work Order Monitoring Checklist
- Stock Replenishment Checklist
- Finished Goods Quality Assurance Checklist
- Kaizen Event Checklist
- Data Backup and Recovery Checklist
- Operational Risk Assessment Checklist
- NPI Project Initiation Checklist
- ISO 14001 Environmental Management Checklist
- Demand Planning Checklist
- Personal Protective Equipment (PPE) Checklist
- Environmental Compliance Checklist
- Energy Efficiency Audit Checklist
- Machine Safety Checklist
- Regulatory Compliance Checklist
- Project Execution Checklist
- Quality Assurance Checklist
- Employee Onboarding Checklist
- ISO 9001 Compliance Checklist
- Production Process Audit Checklist
- Order Fulfillment Checklist
- Incoming Materials Inspection Checklist
- Hazardous Materials Handling Checklist
- Manufacturing System Integration Checklist
- Production Planning
- Manufacturing Employee Onboarding Checklist
- Inventory Management
- Production Operator Performance Evaluation
- Equipment Maintenance Checklist
- Machine Maintenance Checklist
- Receiving and Storage Checklist
- Equipment Maintenance Checklist
- Inventory Control Checklist
- Cycle Counting Checklist
- Preventive Maintenance Checklist
- Daily Production Checklist
- Production Line Quality Control Checklist
- Root Cause Analysis Checklist
- Supplier Quality Audit Checklist
- OSHA Compliance Checklist
- Logistics and Transportation Checklist
- Monthly Manufacturing Performance Review
- Project Closure Checklist
- Environmental Compliance Review
- Workplace Safety Audit Checklist
- IT Systems Maintenance Checklist
- Manufacturing Employee Training Checklist
- Production Line Setup Checklist
- Manufacturing Cybersecurity Checklist
- Electrical Systems Maintenance Checklist
- Manufacturing Project Planning Checklist
- Continuous Improvement Checklist
- Six Sigma Project Checklist
- Workplace Safety Inspection Checklist
- Employee Offboarding Checklist
- Shipping and Receiving Checklist
- Workplace Safety Inspection Checklist
- Sustainability Practices Checklist
- Environmental Compliance Checklist
- Manufacturing Employee Onboarding Checklist
- Hazardous Materials Handling Checklist
- Facility Maintenance Checklist
- Regulatory Compliance Checklist
- Workplace Safety Audit Checklist
- Environmental Compliance Review
- Manufacturing Regulatory Compliance Checklist
- Manufacturing Waste Management Program
Ready to take control of your recurring tasks?
Start Free 14-Day TrialUse Slack? Sign up with one click