Inventory Control Checklist
Pre-Count Setup
Pull the ABC report from NetSuite, Epicor, or Dynamics — whichever drives your item master. A items (top 80% of usage value) get cycle-counted monthly; B items quarterly; C items annually. If the last analysis is older than 12 months, the count cadence is stale.
Lock receipts, issues, and WO backflush during the count window. Coordinate with production scheduling — anything mid-route stays in WIP and is counted separately. Failing to freeze is the #1 reason cycle counts disagree with the system for reasons that have nothing to do with real shrink.
Walk counters through blind-count rules (no system quantity visible on the sheet), lot/heat capture for traceable material, and the variance escalation threshold. New counters always pair with an experienced counter for the first day.
Physical Count Execution
Cover the raw stockroom, line-side kanbans, and any WIP staged at work centers. Capture lot/heat numbers on traceable material — stainless, alloy steel, food-contact resin — so the count doubles as a traceability audit.
A items get a blind recount by a second counter. Disagreement between the two counts triggers a third count before the result goes into the reconciliation worksheet.
Tag anything with no movement in 12+ months, expired shelf life (epoxy, adhesives, food-grade resin), or revs superseded by an ECN. Segregate to the obsolete cage pending disposition — don't write off during the count.
Reconciliation and Variance Investigation
Variance over the materiality threshold (commonly 2% of item value or any single SKU over $500) requires investigation before adjustment. Do not auto-post adjustments through the threshold — that's how real shrink hides for years.
Run 5-why on each material variance. Common root causes: unreported scrap, miscounted receipts, BOM consumption errors on backflush, mis-staged kits, mis-located bins, theft. Document the cause code per SKU.
Plant manager signs off on write-offs above the threshold. Hazardous material (solvents, plating chemistry) routes to the EHS-approved waste stream with manifest under your RCRA generator status — not the dumpster.
Reorder Parameter Tuning
Update ROP using current average daily usage × supplier lead time, plus safety stock sized to demand variability and supplier OTD. Items where supplier OTD has slipped below 90% need a safety-stock bump until the supplier scorecard recovers.
Recompute kanban card count using the takt-based formula: (avg demand × replenishment lead time × safety factor) / container quantity. Flag any line where the new count differs from current by more than one card — those need a walk-the-line review with the cell lead.
Pull OTD %, PPM defective, and lead-time variance per supplier from the last quarter. Suppliers below threshold get a corrective action request from the buyer. Sole-source items with poor scores trigger a second-source feasibility review.
Closeout and Reporting
Report record accuracy (% SKUs within tolerance), inventory turns, days on hand, and total adjustment value. Trend against the prior three quarters — a single quarter in isolation hides whether things are improving.
Use this template in Manifestly
- Production Line Setup Checklist
- Cycle Counting Checklist
- Production Planning
- Equipment Maintenance Checklist
- Machine Maintenance Checklist
- Equipment Maintenance Checklist
- Quality Assurance Checklist
- Receiving and Storage Checklist
- Inventory Management
- Employee Onboarding Checklist
- Hazardous Materials Handling Checklist
- Manufacturing Employee Onboarding Checklist
- Machine Safety Checklist
- Regulatory Compliance Checklist
- Project Execution Checklist
- Production Process Audit Checklist
- Personal Protective Equipment (PPE) Checklist
- Project Closure Checklist
- Environmental Compliance Checklist
- Incoming Materials Inspection Checklist
- Workplace Safety Audit Checklist
- Demand Planning Checklist
- Supplier Quality Audit Checklist
- Data Backup and Recovery Checklist
- Energy Efficiency Audit Checklist
- Environmental Compliance Review
- OSHA Compliance Checklist
- Stock Replenishment Checklist
- Root Cause Analysis Checklist
- Logistics and Transportation Checklist
- Kaizen Event Checklist
- Daily Production Checklist
- Production Line Quality Control Checklist
- Preventive Maintenance Checklist
- Finished Goods Quality Assurance Checklist
- ISO 14001 Environmental Management Checklist
- Production Work Order Monitoring Checklist
- Operational Risk Assessment Checklist
- Manufacturing Employee Training Checklist
- IT Systems Maintenance Checklist
- Employee Offboarding Checklist
- Workplace Safety Inspection Checklist
- Six Sigma Project Checklist
- Manufacturing Project Planning Checklist
- Continuous Improvement Checklist
- Electrical Systems Maintenance Checklist
- Manufacturing Cybersecurity Checklist
- Shipping and Receiving Checklist
- ISO 9001 Compliance Checklist
- Manufacturing System Integration Checklist
- Production Operator Performance Evaluation
- Order Fulfillment Checklist
- Fire Safety and Emergency Preparedness Checklist
- NPI Project Initiation Checklist
- Monthly Manufacturing Performance Review
- Manufacturing Waste Management Program
- Manufacturing Regulatory Compliance Checklist
- Sustainability Practices Checklist
- Supplier Evaluation Checklist
- Manufacturing Employee Training Checklist
Ready to take control of your recurring tasks?
Start Free 14-Day TrialUse Slack? Sign up with one click
