Business Continuity Planning Checklist

Annual workflow for an engineering consulting firm to develop, test, and maintain a business continuity plan that protects sealed-deliverable obligations, active project records, and Engineer of Record authority through a disruption.

6 sections 22 steps Collects data
1

Business Impact Analysis

  1. Inventory mission-critical engineering functions
    • Catalog the functions that cannot pause for more than a workday: sealed deliverable issuance, active project file access, EOR review of RFIs and submittals, and ongoing CA observation reports. Tie each function to the contractual turnaround window it serves so prioritization isn't abstract.

  2. Map dependencies on design platforms and license servers
    • Document upstream dependencies for production: ProjectWise / ACC / BIM 360, Revit and AutoCAD network license servers, specialty solvers (SAP2000, ETABS, RAM, HEC-RAS, IDEA StatiCa), Bluebeam Studio sessions, plotters, and Deltek Vantagepoint for billing. Note vendor SLAs and the contact for each.

  3. Set RTO and RPO targets per critical system
    • RTOs differ sharply between an active CD-phase project (hours) and archived records older than the statute of repose (days). Capture the matrix so backup and failover investment is sized to actual exposure rather than averaged.

    Collects file
  4. Document Engineer of Record continuity exposure
    • List every active project under seal by EOR. Flag projects with no qualified backup PE in the same discipline and state. Confirm the state board's rules on substitute EOR and responsible-charge transfer — these vary and govern what's possible if the original EOR is unavailable.

2

Risk Assessment

  1. Catalog threat scenarios for design operations
    • Cover the realistic set: ransomware encrypting CAD/BIM file servers, office fire or flood, key EOR incapacitation, license server outage, subconsultant failure mid-submittal, ITAR/CUI data exposure. Avoid pure-IT framings — engineering operations also fail when a single licensed PE is unreachable for two weeks.

  2. Score likelihood and impact per scenario
    • Use the BIA outputs from Section 1. Flag any scenario whose recovery time exceeds the RTO of an active CD-phase project. Score impact in terms of contractual penalties, schedule slip, and statute-of-repose claim exposure — not just dollars lost in the disruption window.

  3. Review professional liability exposure
    • Pull the E&O policy. Confirm the claims-made coverage period covers projects through the state's statute of repose (typically 6-12 years from substantial completion). Identify contractual continuity clauses in active owner agreements that obligate specific response windows.

3

Continuity Strategy and Resources

  1. Confirm alternate work site arrangements
    • Validate secondary office capacity, VPN headroom for full-firm remote work, and plotter access at the backup site. A remote-only fallback is acceptable for most disciplines but rarely sufficient for survey, large-format markup review, or sealed-original handling.

  2. Verify off-site backup of project records
    • Test restoration of one sample project end-to-end: sealed PDFs, dated and page-numbered calc packages, native CAD/BIM, specifications, and the revision history table. A backup that hasn't been restored is a backup that doesn't exist.

    Collects list
  3. Remediate backup gaps before plan finalization
    • Document each gap from the restoration test, assign an owner, and close before the BCP is approved. Common findings: native Revit linked-model breakage on restore, missing calc package PDFs, and CAD seal metadata stripped during sync.

  4. Validate license server failover for analysis software
    • Confirm fallback paths for AutoCAD and Revit network licenses, SAP2000, ETABS, HEC-RAS, RAM, and IDEA StatiCa. Standalone seat reserves or vendor cloud-license bridging both work; an unverified failover does not.

  5. Document EOR succession authority
    • Capture named successor PEs by license number, state, and discipline for each active EOR. Reference the state board procedure for substitute EOR notification — most states require written notice, and some require client concurrence.

    Collects file
4

Plan Documentation and Approval

  1. Draft the BCP document
    • Include activation criteria, decision authority, RTO/RPO targets, per-system recovery procedures, EOR succession, and external communication. Anchor the document in the NSPE Code of Ethics paramountcy clause — public safety governs every activation decision.

  2. Build the stakeholder communication tree
    • Owners with active sealed deliverables, AHJs awaiting permit responses, subconsultants on critical path, the E&O carrier, and discipline leads. Include after-hours contacts; a Friday-night ransomware event doesn't wait for Monday.

  3. Document active-project notification procedures
    • Define who contacts each owner on day 1 of activation, what the comment-response and submittal-log status snapshot looks like, and how to request submittal-clock pauses with the AHJ. Pre-drafted language reduces hours of scramble during an actual event.

  4. Obtain principal-in-charge approval of the BCP
    • PIC and firm leadership sign the approved version. Archive in the document management system with a controlled revision number; superseded versions go into the historical folder, not the active one.

    Collects signature Collects file
5

Testing and Training

  1. Run a tabletop exercise on a high-impact scenario
    • Walk a realistic case: ransomware encrypts the CAD/BIM environment two business days before a 60% submittal. Step through activation, EOR notification, owner communication, license-server failover, and submittal-clock pause requests. Time the response and capture friction points.

    Collects list
  2. Document tabletop findings and assign remediation
    • Rank gaps by RTO impact, assign each to a named owner, and set a closure date. Track to completion before the next annual cycle; an open gap from last year's tabletop is a finding the E&O carrier will notice.

  3. Train staff on activation procedures
    • Discipline leads, EORs, IT, and document control receive the activation walkthrough. Refresher annually and on any plan revision. New PEs joining mid-year get the briefing as part of onboarding, not the next annual cycle.

6

Maintenance and Periodic Review

  1. Update plan for personnel and license changes
    • Reflect PE additions and departures, state license renewals and lapses, and any revisions to EOR succession authority. A succession matrix that names a PE who left the firm three months ago is worse than no matrix.

  2. Reverify off-site backup integrity
    • Run a quarterly restoration test on a different sample project than last quarter. Document the evidence — the date, project number, restored artifact list, and any drift from production.

  3. Schedule the next annual BCP review
    • Calendar the next BIA refresh against current project portfolio, personnel, and platform changes. The plan that survived last year's tabletop won't necessarily survive next year's project mix.

Use this template

Copy it to your account, customize the steps, and run it with your team in minutes.


Sections 6
Steps 22
Category Engineering
Price Free to start
Need a different process

Browse hundreds of free templates across every team and industry.

Back to template library

Run Business Continuity Planning Checklist with your team

Customize the steps, assign roles, set a schedule, and keep a complete record for every run.