Pre-Shift Meeting Checklist
Staff Briefing
Chef or sous covers each special: protein source, prep technique, sauce, garnish, allergens, and price. Servers should be able to describe two flavor adjectives and the cook time without reading off a card. Pour a taste of any new wine BTG so the floor can sell it.
Read the 86 board: items out, low-count items ("three left on the lamb"), substitution path for each. Update POS availability so tickets don't fire on items the line can't make.
Pick one upsell target (a high-margin app, a feature cocktail, dessert add-on) and one service KPI (turn time, PPA, dessert attach rate). One target per shift sticks; five targets land as none.
Pull BNB notes from Resy, OpenTable, or SevenRooms: birthdays, anniversaries, regulars, press, allergies. Assign the right server to the right table; brief expo on any timed courses.
Front of House Setup
Pull the book from Resy/OpenTable/SevenRooms. Note peak windows, large parties (6+), and any back-to-back turns under 90 minutes. Compare forecasted covers to the prep par to confirm the kitchen is built for the night.
Print the floor plan with section numbers and assigned servers, busser, food runner, and bar back. Match strong closers to late sections; pair new servers with experienced food runners.
Spot-check menus for stains, tears, and outdated specials inserts. Tables: candles lit, salt and pepper full, condiments wiped, silverware polished, banquettes free of crumbs. Restrooms stocked.
Bartender confirms well liquor par, garnish tray (citrus cut today, olives, cherries), draft lines flowing clean, ice bins full, glassware polished. Note any keg likely to blow mid-service so a backup is staged.
Back of House Line Check
Cold-holding must be 41°F or below. Record walk-in, reach-ins, and low-boys on the temperature log. Anything in the danger zone (41–140°F) is pulled and the unit is flagged for service before the next service begins.
Sous walks each station — sauté, grill, garde manger, pastry — confirming pars on proteins, sauces, garnishes, and starches. Anything below par is fired now, not at first ticket.
Use a test strip on the sanitizer bay: quat ammonia 200–400 ppm or chlorine 50–100 ppm depending on your chemical. Log the reading. Inspectors check the strip box and the log.
Triggered when temps are out of range or par counts are short. Call Sysco / US Foods / Restaurant Depot for an emergency drop, pull from sister location, or 86 the dish before doors open. Document on the prep sheet.
Allergen and Service Protocol
States including MA, IL, MI, NY, and RI require an allergen-aware certified manager (PCFP or AllerTrain) on every shift. Log the certified manager's name; an inspector will ask.
Allergy tickets get dedicated cutting board, fresh gloves, clean tongs, and separate fryer where possible. Expo calls "allergy" loud; the line repeats it back. Cross-contact at plating is the failure point — review which dishes share a fry basket or sauce pot today.
Greet within 60 seconds, water and drink order on the first visit, two-minute check-back after entrée drop, pre-bus before dessert. Reference any recent guest feedback (Yelp, Google, OpenTable comments) so the floor knows what to fix tonight.
Health, Safety, and Open the Doors
Clean chef coats, aprons changed, non-slip shoes on every BOH and FOH staff member, hair tied back or capped, jewelry per code. Send anyone non-compliant home to change before the door opens — OSHA and health both cite on this.
Hand sinks (separate from prep and three-bay) need hot water, soap, and single-use towels. Remind line: 20 seconds, between tasks, after handling raw protein, after breaks. No bare-hand contact with ready-to-eat food — gloves or tongs.
Liquor license posted and unexpired, current health permit, food handler / ServSafe certificates on file, OSHA 300A summary if posting season (Feb 1 – Apr 30), allergen poster, choke-saver poster. Photograph anything expiring within 30 days.
Open Toast / Square / Aloha, fire a test ticket to each printer and the KDS, run a $0.01 test charge on the card reader to confirm gateway is live. A POS that fails at 6:30 means tickets on paper and a slammed line.
Manager confirms every section above, signs the line check, and unlocks the front. Music to service level, lights to service level, open sign on. Note the time the door opened for the shift report.
Use this template in Manifestly
- Restaurant Hiring Checklist
- Restaurant Security Checklist
- Weekly Staff Scheduling Checklist
- Restaurant Closing Checklist
- Manager Daily Walkthrough
- Restaurant Opening Checklist
- Restaurant Employee Termination Checklist
- Restaurant Maintenance Checklist
- Food Safety Checklist
- Server Side Work Checklist
- Restaurant Closing Cleaning Checklist
- Weekly Inventory Management Checklist
- Daily Kitchen Cleaning Checklist
- Staff Training Checklist
- Restaurant Opening Checklist
- Restaurant Inventory Count Checklist
- Restaurant Closing Checklist
- Restaurant Equipment Maintenance Checklist
- Food Safety and Hygiene Checklist
- Restaurant Employee Onboarding Checklist
- Front-of-House Operations Checklist
- Restaurant Cleaning Checklist
- Bar Opening and Closing Checklist
- Food Prep Checklist
- Table Setting and Presentation Checklist
- Food Waste Log Checklist
- Workplace Safety and Ergonomics Checklist
- Restaurant Bathroom Cleaning Checklist
- Cash Handling and Management Checklist
- Customer Service Excellence Checklist
- Food Ordering and Receiving Checklist
- Employee Termination Checklist
- Takeout and Delivery Service Checklist
- Morning Prep Checklist
- Perishables Stocking Checklist
- Restaurant Opening Checklist
- Food Allergy and Special Diets Checklist
- Kitchen Closing & Cleanup Checklist
- Restaurant Cross-Training Checklist
- Recipe Consistency Checklist
- Guest Experience Checklist
- Kitchen Deep-Clean Checklist
- Restaurant Safety Training Checklist
- Food Storage Checklist
- Staff Uniform Checklist
- Work Schedule and Shift Swap Checklist
- Table Setting Checklist
- Promotion and Discount Checklist
- Menu Knowledge Checklist
- Restaurant Tax Preparation Checklist
- Staff Training Program Checklist
- Food Presentation and Plating Standards Checklist
- Restaurant Closing Checklist
- Security System Check Checklist
- Beverage Quality Checklist
- Restaurant Insurance Review Checklist
- Restaurant Quality Control Checklist
- Wine and Beverage Inventory Checklist
- Annual Business Goals Review Checklist
- Employee Scheduling and Labor Management Checklist
- Restaurant HR Compliance and Record-Keeping Checklist
- Restaurant Partnership and Collaboration Checklist
- Supplier and Vendor Evaluation Checklist
- Daily Specials and Menu Update Checklist
- Weekly Cleaning Checklist
- End-of-Day Sales Reconciliation Checklist
- Daily Cleaning Checklist
- Prep Station Setup Checklist
- Vendor Order Checklist
- Monthly Maintenance Checklist
- Order Accuracy Checklist
- Restaurant Payroll Processing Checklist
- Restaurant Technology Backup Checklist
- Private Event & Buyout Planning Checklist
- Restroom Refresh and Inspection Checklist
- Reservation Management Checklist
- Guest Complaint Resolution Checklist
- Service Timing Checklist
- Pre-Shift Employee Health Screening Checklist
- Health and Safety Compliance Checklist
- Health Inspection Readiness Checklist
- New Menu Item Development Checklist
- Restaurant Marketing and Promotion Checklist
- Restaurant Reservation Management Checklist
- Restaurant Emergency Procedures Checklist
- Point of Sale System Management Checklist
- Customer Feedback and Resolution Checklist
- Monthly Budget Review Checklist
- Restaurant Permit and Licensing Renewal Checklist
- Restaurant Event Planning Checklist
- Inventory Reconciliation Checklist
- Restaurant Technology Systems Checklist
- Restaurant Remodeling and Maintenance Checklist
- Kitchen Equipment Start-Up Checklist
- Restaurant Sustainability Practices Checklist
- Menu Engineering and Profitability Checklist
- Front-of-House Opening Checklist
- Front-of-House Shutdown Checklist
- Non-Perishables Restocking Checklist
- Food Safety Compliance Checklist
- Portion Control Checklist
- Beverage Restock Checklist
- New Hire Paperwork Checklist
- Restaurant Social Media Strategy Checklist
- Customer Loyalty Program Checklist
- Restaurant Policy Update Checklist
- POS System Update Checklist
- Supply Quality Checklist
- Kitchen Equipment Calibration Checklist
- Restaurant New Hire Checklist
- Uniform and Appearance Standards Checklist
- Restroom Cleaning Checklist
- Restaurant Employee Training Checklist
- Equipment Safety Checklist
- Daily Inventory Checklist
- Daily Prep Task Checklist
- Food Storage and Rotation Checklist
- Server Customer Service Training Checklist
- Guest Feedback Collection Checklist
- Digital Menu Update Checklist
- Taste Testing Checklist
- Employee Performance Review Checklist
- Restaurant Licensing Renewal Checklist
- Restaurant Marketing Plan Checklist
- Monthly Restaurant Inspection
Ready to take control of your recurring tasks?
Start Free 14-Day TrialUse Slack? Sign up with one click
