Requirement Gathering Checklist
Steps a product manager or tech lead runs at the start of a new software project to elicit, document, and validate requirements before engineering kicks off implementation.
Business Context and Discovery
-
Map stakeholders and decision-makers
The product manager builds a stakeholder map covering the executive sponsor, business owner, end-user representatives, engineering lead, design lead, and any compliance / security reviewers. Note who has sign-off authority vs. who is consulted — confusing the two is the most common reason requirements get re-litigated mid-sprint.
Collects text Collects file -
Document the business objectives and success metrics
Capture 2-4 measurable outcomes the project must move — activation rate, time-to-onboard, support ticket volume, ARR retention. Vague objectives ("improve UX") are the leading cause of scope creep; if you can't write the success metric as a number with a target, push back before continuing.
-
Identify regulatory and compliance scope
Determine whether the feature touches PHI (HIPAA), cardholder data (PCI), EU resident data (GDPR), or California residents (CCPA/CPRA). Flag accessibility scope (WCAG 2.1 AA) for any public-facing UI. Compliance constraints become non-functional requirements that change the design — surfacing them late is expensive.
Collects list -
Review competitive and user research inputs
Pull existing user interviews, support ticket themes, NPS verbatims, and competitor teardowns. Don't restart research that's already been done — check the research repo (Dovetail, Notion, Confluence) before scheduling new interviews.
Elicitation Sessions
-
Conduct stakeholder interviews
Run 30-45 minute 1:1 interviews with each stakeholder group. Use open-ended prompts ("walk me through how you do this today") before closed ones. Record with consent; have a second interviewer take notes so the lead can listen. Aim for 5-8 interviews before synthesizing.
-
Run a user-story workshop
Facilitate a story-mapping or event-storming session with engineering, design, and the business owner. Use the "As a [persona], I want [outcome], so that [value]" format. Capture the workshop board (Miro, FigJam) as the source artifact for the next step.
-
Survey the broader user base
Send a targeted survey (Typeform, Google Forms, in-app) to validate that interview themes generalize. Keep it under 8 questions; mix Likert with one open-ended. Aim for n≥30 responses before treating results as signal, not anecdote.
-
Synthesize findings into themes
Cluster interview notes, workshop output, and survey results into 3-7 themes. Each theme should have a problem statement, the evidence behind it (quotes, counts), and a candidate scope decision (in / out / later).
Requirement Definition
-
Write functional requirements as acceptance criteria
Use Given/When/Then or numbered AC under each user story in Jira / Linear. Each criterion is testable as a single assertion — if QA can't write a test from it, it's not done. Avoid soft verbs like "support" or "handle" without specifying inputs and outputs.
-
Specify non-functional requirements (NFRs)
Cover performance (p95 latency targets), availability (SLO), security (authn/authz model, encryption at rest/in transit), accessibility (WCAG 2.1 AA), and observability (what gets logged/metricked). NFRs ignored at requirement time become production incidents at launch.
-
Define data model and integration touchpoints
List entities, fields, retention rules, and PII classification. Identify upstream/downstream systems (CRM, billing, analytics) and the contract with each — REST endpoint, event topic, webhook. New external dependencies require vendor security review; flag them now, not in code review.
-
Document assumptions, constraints, and out-of-scope items
An explicit out-of-scope list prevents "I thought that was included" arguments at the demo. Include known constraints — browser support matrix, mobile OS minimums, data residency, third-party rate limits.
Review and Validation
-
Hold the requirements review with engineering and design
The tech lead reviews for technical feasibility and rough sizing (T-shirt or story points). Design reviews for UX coherence. Capture concerns as comments on the requirements doc; resolve or defer each one explicitly before sign-off.
-
Run a security and privacy review
AppSec reviews the threat model — STRIDE, data flow, trust boundaries. Privacy reviews data minimization, retention, lawful basis for processing, and DPIA need under GDPR. Required separately when the regulatory-data answer earlier was Yes.
-
Prioritize requirements with MoSCoW
Tag each requirement Must / Should / Could / Won't. The Must list is the MVP; Should items go into v1.1 backlog; Won't is documented to close the loop with stakeholders who asked for them. If the Must list exceeds engineering's capacity estimate, negotiate now.
-
Capture stakeholder sign-off
The executive sponsor and business owner sign off on the final requirements document. Verbal "sounds good" in a Slack thread is not sign-off — get a name attached to the artifact in writing.
Collects list Collects signature Collects paragraph
Rework and Re-review
-
Address sponsor feedback and update the requirements doc
Resolve each comment with a change to the doc or a written rationale for keeping current language. Track the diff so reviewers can re-review just the deltas, not the entire document.
-
Re-circulate for sign-off
Handoff and Change Management
-
Import requirements into Jira or Linear as epics and stories
Each Must-have requirement becomes an epic; each acceptance criterion becomes a story or task. Link back to the requirements doc URL on every epic so future readers can trace the origin without asking around.
-
Establish the change-control process
Document who can approve scope changes mid-build, what triggers a full re-review (e.g., any change to NFRs, data model, or compliance scope), and where change requests are filed. Without this, every "small tweak" becomes a side-channel Slack ask.
-
Hold the engineering kickoff
Walk the engineering team through the requirements, NFRs, and out-of-scope list. Confirm the tech lead has identified a technical design owner for the architecture doc that follows. Sprint planning for sprint 1 happens in this same week.
Use this template
Copy it to your account, customize the steps, and run it with your team in minutes.
Browse hundreds of free templates across every team and industry.
Back to template libraryRun Requirement Gathering Checklist with your team
Customize the steps, assign roles, set a schedule, and keep a complete record for every run.