Building Code Compliance Checklist
Inspection Prep and Scheduling
Pull the prior year's compliance file from AppFolio or Buildium, including any open items the AHJ flagged. Carry forward unresolved deficiencies so they don't get re-inspected without a fix.
Verify which IBC, IFC, NEC, IPC, and IECC editions your jurisdiction has adopted — many cities lag the model code by 3-6 years and amend specific chapters. Don't inspect against the current ICC version if your AHJ enforces the 2018 edition.
Most state landlord-tenant acts require 24-48 hours written notice before non-emergency entry. Send the notice by the lease's required method (email, posted, or both) and log delivery — undocumented entry is a common tenant complaint that surfaces during code disputes.
Fire Safety and Life Safety
Functional test every detector, replace 9V batteries, and replace any unit past its 10-year manufacture date stamp. Many states (MA, CA, NY) require a signed certification at turnover and on annual inspection — log the test date and tech initials per unit.
NFPA 10 requires annual service by a licensed contractor with a dated tag, plus a 6-year internal exam and 12-year hydrostatic test. Check the gauge is in the green, the pin and seal are intact, and the unit is mounted at the required height (max 5 ft to the top for units under 40 lb).
Egress paths must be unobstructed at the required width, exit signs illuminated, and emergency lighting batteries hold the 90-minute IBC discharge test. Tenant storage in stairwells is the most common citation — photograph and issue cure notices the same day.
NFPA 25 requires quarterly, annual, and 5-year sprinkler inspections by a licensed contractor. Pull the latest ITM report, confirm any deficiencies were corrected, and verify the FDC caps are present and the riser room is accessible.
Electrical Systems
Per NEC 210.8, GFCI is required within 6 ft of sinks, in bathrooms, kitchens, garages, outdoors, and laundry. AFCI is required in bedroom and living-area circuits per NEC 210.12. Use the test button on each outlet and confirm the breaker trips — a non-tripping GFCI is a citation and a real shock-hazard liability.
NEC 110.26 requires 36 inches of working clearance in front of the panel. Confirm every breaker is labeled, no double-tapped breakers, no Federal Pacific or Zinsco panels in service (these are insurance-flag panels and frequently require replacement).
Plumbing and Water Safety
Check under every sink, around water heaters, and at washing machine hookups. A slow drip behind a vanity is the leading cause of mold claims that turn into habitability suits — photograph anything questionable and open a work order before moving on.
Set point should be 120°F to prevent scalding (per CPSC) while still controlling Legionella risk. Verify the T&P relief valve has a discharge pipe routed within 6 inches of the floor and the seismic straps are intact in seismic zones.
Most jurisdictions require annual backflow testing by a certified tester with the report filed to the water utility. Missing this is a fineable offense and can result in service shutoff. Pull the test report and confirm filing with the city.
Accessibility and ADA Compliance
2010 ADA Standards require ramp slope no steeper than 1:12 with 36-inch clear width and handrails on both sides for runs over 6 inches rise. Thresholds at accessible entries cannot exceed 1/2 inch with a beveled edge. Use a digital level and document readings.
Permanent room signs (restrooms, stairwells, exits) require raised characters and Grade 2 braille mounted 48-60 inches above finished floor on the latch side per ADA 703. Tape-on paper signs do not satisfy this.
ASME A17.1 and ADA require a hands-free two-way emergency phone that connects to a 24/7 monitored line. Pick up the phone, confirm it dials, and confirm the responder can identify the building and car. Verify the annual elevator certificate is posted and current.
Structural and Envelope
Look for differential settlement cracks wider than 1/4 inch, water staining at the foundation, missing or curled shingles, and deteriorated flashing at penetrations. Photograph any horizontal crack in a foundation wall — that's a structural-engineer referral, not a patch job.
IBC requires guards at 42 inches on commercial decks and 36 inches in residential, with balusters spaced so a 4-inch sphere cannot pass. Push-test every railing — wobbly guardrails on second-floor decks are a frequent serious-injury claim.
Roll up the structural findings into a single result for the run. If anything was flagged as 'failed,' the engineering review branch fires; minor cosmetic issues should be logged but don't escalate.
HVAC and Indoor Air Quality
Use the MERV rating specified by the equipment manufacturer — going too high (e.g., MERV 16 in a residential air handler) chokes airflow and burns out blower motors. Log the date and rating per unit so the next turnover knows what's installed.
Lint-clogged dryer vents are a leading cause of multifamily fires per NFPA. Confirm runs terminate to the outside (not the attic), backdraft dampers operate, and bathroom fans actually move air — tape a tissue to the grille and verify suction.
Gas water heaters and furnaces need proper draft, no backdrafting at the draft hood, and CO detectors within 10 feet of sleeping areas per IRC R315. Run the appliances and hold a smoke pencil at the draft diverter — if smoke rolls out, lock out the unit and call the gas-fitter same day.
Engineering Review and Remediation
Send photos and inspection notes to a PE licensed in your state. Do not attempt remediation before the engineering letter — patching a structural crack without a sealed report can void insurance and constitutes unpermitted structural work in most jurisdictions.
Documentation and Sign-Off
Every flagged item gets a work order in AppFolio or Buildium with the code citation, the unit, the assigned vendor, and a target date. A finding without a corresponding work order is the single most common gap an AHJ re-inspection catches.
Bundle the inspection report, photos, fire and elevator certificates, backflow test report, and any engineer letters into one PDF kept in the property file. This is what the AHJ asks for first if a complaint surfaces mid-year.
Use this template in Manifestly
- Rental Payment Checklist
- Property Management Office Spring Cleaning
- Security Deposit Checklist
- Apartment Turnover Maintenance Checklist
- Annual Rental Property Inspection
- Property Inspection Checklist
- Tenant Eviction Checklist
- Tenant Move-Out Checklist
- Employee Training Checklist
- Property Maintenance Inspection Checklist
- Pet and Assistance Animal Approval Checklist
- Tenant Offboarding Checklist
- Tenant Move-In Checklist
- Lease Agreement Checklist
- Tenant Screening Checklist
- Property Manager Performance Review
- Vendor Performance Evaluation Checklist
- Tenant Onboarding Checklist
- Rent Roll Audit Checklist
- Employee Offboarding Checklist
- Service Contract Renewal Checklist
- Utility Management Checklist
- Eviction Process Checklist
- Tenant Communication Checklist
- Monthly Financial Reporting Checklist
- Capital Expenditure Planning Checklist
- Vendor Onboarding Checklist
- Roof Inspection Checklist
- Contractor Management Checklist
- Property Tax Review Checklist
- HR Compliance Checklist
- Rent Increase Notice Checklist
- Rent Collection Process Checklist
- Payroll Processing Checklist
- Property Inspection Checklist
- Emergency Contact List Maintenance
- Annual Budget Preparation Checklist
- Employee Records Management Checklist
- Property Acquisition Due Diligence Checklist
- Property Showing Checklist
- Accessibility Compliance Checklist
- Tenant Eviction Checklist
- Lease Renewal Checklist
- Legal Document Storage Checklist
- Seasonal Maintenance Checklist
- Investment Analysis Checklist
- Appliance Maintenance Checklist
- Tenant Move-Out Checklist
- Move-In Package Preparation
- Property Management Staff Onboarding Checklist
- Property Management Software Implementation Checklist
- Security Audit Checklist
- Sustainable Procurement Checklist
- Water Conservation Measures Checklist
- Emergency Preparedness Checklist
- Grounds Maintenance Checklist
- Green Building Standards Checklist
- Energy Efficiency Audit Checklist
- Data Backup and Recovery Checklist
- HVAC Maintenance Checklist
- Tenant Applicant Screening
- Routine Property Inspection Checklist
- New Property Management Onboarding
- Leasing Process Checklist
- Rental Advertisement Checklist
- Annual Insurance Review Checklist
- Plumbing Maintenance Checklist
- Preventive Maintenance Checklist
- Property Risk Assessment Checklist
- Pest Control Checklist
- Property Safety Inspection Checklist
- IT Equipment Inventory Checklist
- Disaster Recovery Plan Checklist
- Move-Out Procedure Checklist
- Cybersecurity Protocol Checklist
- Lease Signing Checklist
- Pool Maintenance Checklist
- Rental Market Analysis Checklist
- Electrical System Maintenance Checklist
- Common Area & Turnover Cleaning Checklist
- Fair Housing Compliance Checklist
- Legal Compliance Checklist for New Properties
- Lease Agreement Checklist
- Tenant Screening Checklist
- New Tenant Move-In Checklist
- Real Estate Portfolio Review Checklist
- Fair Housing Compliance Audit
- Lease Renewal Checklist
- Tenant Screening Checklist
- Rental Rate Analysis Checklist
- Move-In/Move-Out Inspection Checklist
- Eviction Process Checklist
- Rental Property Inspection Checklist
- Property Maintenance Inspection Checklist
- Rent Collection Checklist
- Risk Management Checklist
- Regulatory Compliance Checklist
- Quarterly Internal Control Review Checklist
- Sales Tax Reporting Checklist
- Legal Entity Management Checklist
- Employee File Audit Checklist
- Anti-Money Laundering Compliance Checklist
- SOX Compliance Checklist
- GDPR Compliance Review Checklist
- IT Security Audit Checklist
- HR Compliance Checklist
- Payroll Processing Checklist
- Employee Records Management Checklist
- Legal Document Storage Checklist
- Security Audit Checklist
- Property Risk Assessment Checklist
- Property Safety Inspection Checklist
- Cybersecurity Protocol Checklist
- Fair Housing Compliance Checklist
- Legal Compliance Checklist for New Properties
- Lease Agreement Checklist
- Software Licensing Compliance Checklist
- PCI DSS Compliance Checklist
- Real Estate Legal Compliance Checklist
- HIPAA Compliance Checklist
- MLS Listing Review Checklist
- Real Estate License Renewal Checklist
- GDPR Compliance Checklist
- Real Estate Contract Review Checklist
- Fair Housing Compliance Audit
- Listing Agreement Intake Checklist
- ISO/IEC 27001 Compliance Checklist
- HR Compliance Checklist
- Real Estate Ethics & Compliance Review
- Brokerage Trust Account Management Checklist
- Real Estate Professional Development Checklist
- Brokerage Technology Inventory Audit
- Real Estate Website Audit Checklist
- Continuing Education Checklist
- Employee Termination Checklist
- Employee Records File Audit
- Regulatory Compliance Checklist
- Brokerage HR Policy Compliance Checklist
- Employee Handbook Annual Review
- Employee Termination Checklist
- Data Privacy Compliance Checklist
- Risk Management Checklist
- Insurance Compliance Checklist
- Complaint Resolution Checklist
- Financial Audit Checklist
- Data Security Checklist
- Risk Mitigation Checklist
- Claims Auditing Checklist
- Quarterly Industry Standards Compliance Review
- Insurance Training and Development Checklist
- Anti-Money Laundering Checklist
- Training Evaluation Checklist
- Manufacturing Regulatory Compliance Checklist
- Training Needs Assessment Checklist
- Skills Development Checklist
- Audit Preparation Checklist
- Network Security Checklist
- Employee Offboarding Checklist
- IT Asset Inventory Management Checklist
- Regulatory Reporting Checklist
- Compliance Audit Checklist
- Insurance Program Initiation Checklist
- Insurance Program Launch Project Monitoring Checklist
- Training Materials Checklist
- Quarterly Risk Monitoring Checklist
- System Backup Checklist
- Employee Benefits Checklist
- Insurance Program Launch Execution Checklist
- Insurance Marketing Campaign Checklist
- Email Compliance Checklist
- Law Firm Compliance Checklist
- Anti-Money Laundering Compliance Checklist
- Law Firm Compliance Checklist
- Professional Responsibility Compliance Review
- Data Privacy Compliance Checklist
- Law Firm Risk Management Checklist
- HR Audit Checklist
- HR Compliance Checklist
- Email Deliverability Checklist
- Law Firm Ethics Compliance Review
- Document Retention Policy Checklist
- Employee File Audit Checklist
- Law Firm Risk Management Checklist
- Cloud Security Checklist
- User Access Review Checklist
- IT Regulatory Compliance Review
- Compliance Audit Checklist
- Security Audit Checklist
- Business Continuity Checklist
- Employee Termination Checklist
- Quarterly Operations and Compliance QA Review
- Expense Management Checklist
- Advisor and Employee Onboarding Checklist
- Client Satisfaction Survey Checklist
- Operational Risk Checklist
- Know Your Customer (KYC) Checklist
- Litigation Preparation Checklist
- Contract Review Checklist
- New Hire Onboarding Checklist
- Client Onboarding Checklist
- Contract Review Checklist
- Regulatory Compliance Checklist
- Monthly Financial Reporting Checklist
- Regulatory Reporting Checklist
- Intellectual Property Management Checklist
- Internal Audit Checklist
- Lead Generation Checklist
- Annual Financial Reporting Checklist
- Annual Compliance Program Review
- Annual Risk Assessment Checklist
- Data Security Review Checklist
- Quarterly Performance Measurement Checklist
- Financial Services Project Initiation Checklist
- IT Policy Review Checklist
- Data Protection Checklist
- E-commerce Sales Tax Reporting Checklist
- Project Execution Checklist
- Project Planning Checklist
- Project Monitoring Checklist
- Financial Statement Review Checklist
- Quarterly Compliance Monitoring Checklist
- Cybersecurity Risk Assessment Checklist
- Project Closure Checklist
- Financial Services IT Security Audit Checklist
- PCI DSS Compliance Checklist
- Advisor and Staff Onboarding Checklist
- Cybersecurity Incident Response Checklist
- E-commerce Risk Management Checklist
- CRM Data Entry Checklist
- Business Continuity Plan Checklist
- E-commerce Legal Compliance Checklist
- Vendor Contract Review Checklist
- Annual Risk Management Review Checklist
- Risk Assessment Checklist
- Agency Compliance and Risk Management Checklist
- Annual School Compliance Audit
- School First Aid and Emergency Medication Audit
- Motor Carrier TSA Security Compliance Checklist
- Internal Controls Checklist
- Client Communication Checklist
- Restaurant Permit and Licensing Renewal Checklist
- New Hire Paperwork Checklist
- Restaurant Policy Update Checklist
- Restaurant New Hire Checklist
- Annual Attorney Professional Conduct Review
- International Fuel Tax Agreement (IFTA) Quarterly Filing Checklist
- Restaurant Licensing Renewal Checklist
- Marketing Strategy Checklist
- Department of Transportation (DOT) Audit Checklist
- Retail Policy Update and Compliance Checklist
Ready to take control of your recurring tasks?
Start Free 14-Day TrialUse Slack? Sign up with one click