Employee Onboarding Checklist

Onboarding workflow for a new manufacturing hire — from offer acceptance through pre-day-1 setup, plant orientation, role-specific training, and 90-day check-in. Run by HR with the hiring supervisor, EHS, and IT.

4 sections 19 steps Collects data
1

Pre-Day-1 Setup

  1. Complete I-9 and E-Verify
    • Section 1 of Form I-9 must be completed by end of day 1; Section 2 (document review) within 3 business days of start. Run E-Verify within 3 days of hire if enrolled. Retain original documents per the M-274 handbook — copies in the HRIS, not in a paper drawer.

  2. Capture role classification and pay details
    • FLSA exempt vs. non-exempt drives timekeeping, overtime, and shift differential rules. Hourly production roles are typically non-exempt — confirm before pay setup, since misclassification triggers DOL back-wage exposure.

    Collects list
  3. Send offer letter for signature
    • Include start date, shift assignment, pay rate, at-will language, and any restrictive covenants reviewed by counsel. For union shops, reference the applicable CBA wage scale and probationary period.

    Collects file
  4. Initiate background check and drug screen
    • Drug screen panel depends on role — DOT-regulated drivers require 49 CFR Part 40; safety-sensitive production roles typically use a 5- or 10-panel. Watch state-specific marijuana carve-outs (NY, NJ, CA) and FCRA disclosure timing on the background check.

  5. Provision IT accounts and badge
    • Email, ERP (NetSuite / Epicor / Plex), MES, time-clock profile, and physical access badge with the right zone permissions. Floor employees rarely need a laptop but always need a time-clock PIN before shift 1 — missing this strands them at the clock on day 1.

  6. Stage PPE and uniform issue
    • Safety glasses, hearing protection, steel-toe boots (or boot voucher per your policy), cut-resistant gloves, and FR clothing if the role requires it. Size to the employee — generic stock is the most common reason a new hire's first-week PPE compliance slips.

    Collects list
2

Day 1 Orientation

  1. Welcome and HR paperwork review
    • W-4, state withholding, direct deposit, benefits enrollment window, handbook acknowledgment, EEO self-ID, and emergency contact. Confirm every form is signed before sending the new hire to the floor — chasing signatures after week 1 is the usual failure mode.

  2. Deliver HazCom and SDS training
    • OSHA 1910.1200 requires HazCom training before exposure to hazardous chemicals — not after. Walk the SDS binder location (or digital portal), label reading (HMIS / NFPA 704), and the chemicals actually present in their work area, not a generic deck.

  3. Cover LOTO awareness training
    • Per 1910.147, all affected employees get awareness training; authorized employees who actually apply locks get the full procedure-specific training before they service equipment. Distinguish the two during onboarding so you don't accidentally credential an affected-only worker as authorized.

  4. Walk emergency action plan and muster point
    • Show the EAP per 1910.38: alarm signals, evacuation routes from their work cell, muster point, AED and eyewash locations, and how to report a near miss. Walking the route beats pointing at a map.

  5. Tour the plant with the supervisor
    • Receiving → raw stockroom → their work center → WIP staging → final inspection → shipping. Introduce the cell lead, quality inspector, and material handler they'll work with daily. End at the time clock and break room.

3

Role-Specific Training

  1. Issue forklift or PIT certification training
    • OSHA 1910.178 requires equipment-specific training and an evaluation before unsupervised operation. A counterbalance certification does not cover a reach truck or order picker — train per equipment type the employee will actually drive.

  2. Train on work instructions for the assigned cell
    • Walk the routing, traveler, and current-rev work instructions for every operation in their cell. Verify document rev against PLM (SolidWorks PDM, Arena, Windchill) — outdated printouts at the workstation are a common defect source.

  3. Pair with a mentor for on-the-job training
    • Assign a named mentor — not just "whoever's on shift." Mentor signs off skill milestones on the training matrix: setup, first-piece, in-process inspection, scrap reporting, andon escalation. Most quality issues in the first 60 days trace back to a missing mentor signoff.

  4. Train on quality and inspection requirements
    • Cover FAI requirements at changeover, in-process sampling per the control plan, gauge use (caliper, micrometer, pin gauge, comparator), and the NCR / red-tag procedure when something is out of spec. Reference the QMS — ISO 9001, AS9100, IATF 16949, or ISO 13485 as applicable.

  5. Confirm role requires PIT operation
    • Material handlers, receivers, and many cell operators run powered industrial trucks; assemblers and inspectors usually don't. Confirm before scheduling the certification block — pulling someone from the floor for unneeded training burns capacity.

    Collects list
4

30/60/90 Day Milestones

  1. Hold the 30-day supervisor check-in
    • Review training matrix progress, attendance, safety incidents or near-misses logged, and any quality escapes traced to the new hire. Surface roadblocks early — most voluntary attrition in manufacturing happens in the first 90 days.

  2. Verify training matrix completion at 60 days
    • Pull the training matrix from the LMS (or paper file). All required mentor signoffs should be complete; flag any gaps for follow-up training before the 90-day review.

  3. Conduct the 90-day probationary review
    • Supervisor and HR jointly assess: skill milestones met, attendance, safety record, fit. Capture the disposition — confirm, extend probation, or separate — with a documented rationale. Union shops must follow the CBA's probationary clock exactly; missing it converts the employee to regular status by default.

    Collects list Collects paragraph Collects file

Use this template

Copy it to your account, customize the steps, and run it with your team in minutes.


Sections 4
Steps 19
Category Manufacturing
Price Free to start
Need a different process

Browse hundreds of free templates across every team and industry.

Back to template library

Run Employee Onboarding Checklist with your team

Customize the steps, assign roles, set a schedule, and keep a complete record for every run.