Production Line Quality Control Checklist
Quality control workflow that runs alongside a production work order — from incoming material verification through first-article inspection, in-process SPC sampling, final AQL inspection, and non-conforming material disposition. Run by the production supervisor with quality, o...
Raw Material Inspection
-
Verify supplier C of C and lot traceability
Receiving clerk pulls the supplier's Certificate of Conformance and matches lot / heat numbers on the material tag against the packing slip and PO. Capture the lot number in the WMS receiving record so traceability follows the material into WIP.
-
Check material against PO and drawing spec
Confirm grade, temper, gauge, and dimension call-outs match the engineering drawing rev currently released in PLM. Substitution by the mill is a common gotcha — the C of C may list an equivalent grade that the customer drawing does not allow.
-
Inspect for damage, corrosion, and shelf life
Visually inspect for handling damage, surface corrosion, and contamination. For adhesives, resins, and any time-dated material, confirm the lot is within shelf life and that storage conditions on the C of C have been met during transit.
-
Run PMI on alloy-critical stock
Use the XRF / OES gun to verify alloy on stainless, Inconel, and any pressure-rated stock before release to the floor. Wrong alloy mixed into a pressure part is the kind of mistake that causes field failures — positive material identification is non-negotiable on alloy-critical materials.
-
Sample per ANSI Z1.4 AQL plan
Pull the sample size dictated by the AQL plan for this material category — typically Level II Normal inspection. Measure critical dimensions on the sample with calibrated gauges and record results on the incoming inspection sheet.
Collects list -
Open an incoming NCR and segregate the lot
Tag the lot with a red hold tag and move it to the MRB cage. Open the NCR in the QMS with the supplier name, lot, defect, and a photo. The buyer notifies the supplier the same day so the supplier can begin a containment response and replacement shipment.
Setup and First-Article Inspection
-
Confirm work order rev and released drawings
Cross-check the routing rev on the traveler against the current released rev in PLM. Pending ECNs that affect this part must be resolved before setup — running the prior rev after an ECN release is a frequent scrap event.
-
Verify tooling and gauge calibration status
Pull the gauges called out on the inspection sheet from the gauge crib and check each calibration sticker. Past-due gauges are red-tagged and replaced before setup begins. Also verify tool inserts and fixtures match the setup sheet — wrong insert is a common scrap-on-first-piece cause.
-
Run setup per the setup sheet
Setup operator loads the program (CNC) or recipe (process), seats the fixture, and zeros the work offsets. Setup-reduction (SMED) goal for this work center is documented on the setup sheet — flag any setup running over target so the cell lead can investigate.
-
Perform FAI per AS9102 or internal inspection sheet
Quality runs the first piece across every characteristic on the ballooned drawing. CMM is required for any GD&T callout. Do not release-to-run until FAI is signed by Quality — running 200 parts before discovering a setup error is the canonical reason changeovers go sideways.
Collects list -
Correct the setup before release-to-run
If FAI failed, adjust offsets, re-zero, or swap tooling per the deviation pattern. Re-run the first piece and re-submit for FAI. Document each correction attempt on the traveler so the manufacturing engineer can review setup capability later.
In-Process Monitoring
-
Log hourly piece count and downtime reasons
Operator records pieces produced and any downtime against standard reason codes (changeover, breakdown, material wait, quality hold). This data feeds OEE and the morning Gemba review — codes left blank distort availability and performance.
-
Sample in-process per the SPC plan
Pull the in-process sample at the frequency on the control plan (typically every Nth piece or every hour). Measure variable characteristics with the calibrated gauge specified for that feature; record on the SPC sheet or directly into InfinityQS / Minitab.
-
Update the X-bar R chart and check rules
Plot the new subgroup and check Western Electric / Nelson rules — points out of control limits, runs of seven, trends. Out-of-control conditions trigger the reaction plan on the control plan, which usually means andon and supervisor review before continuing the run.
-
Audit operator adherence to work instructions
Supervisor or quality engineer performs a layered process audit (LPA) at the cell. Confirm the operator is following the current rev of the work instruction, that PPE is correct, and that poka-yoke devices are in place and functioning.
Final Inspection and Packaging
-
Perform final inspection per AQL sampling plan
Quality inspector pulls the AQL sample (ANSI Z1.4, Level II Normal unless customer specifies otherwise) from the completed lot. Measure critical-to-quality dimensions and inspect cosmetic features against the boundary samples. Reject the lot if defectives exceed the acceptance number.
Collects list -
Verify packaging, labels, and lot codes
Confirm packaging configuration matches the customer's packing instruction — count per carton, dunnage, desiccant, ESD bag where applicable. Verify the lot code on the carton label matches the WO traveler so traceability survives downstream.
-
Capture finished-goods photos for the batch record
Upload photos of the finished part, the carton label, and the palletized configuration. These attachments are the backstop when a customer reports a damage or labeling issue weeks after shipment.
Collects file -
Sign off the batch quality record
Quality manager reviews the FAI, in-process SPC, final inspection results, and any deviation notes. Disposition the batch as Released, Released with rework, or Rejected. The batch record is the audit-trail artifact for ISO 9001 / IATF 16949 surveillance.
Collects list Collects signature Collects paragraph
Non-Conformance and Closeout
-
Segregate non-conforming parts to the MRB cage
Apply red hold tags and move parts to the MRB area. Un-segregated rejects mixed back into stock is the most common cause of customer escapes — the cage discipline is the control.
-
Open the NCR with MRB disposition
Open the NCR in the QMS with quantity, defect description, and root-cause hypothesis. The MRB (engineering, quality, production) dispositions to rework, scrap, use-as-is with deviation, or return-to-supplier. NCRs left open past 30 days escalate to the quality manager.
Collects list -
Close the work order with actuals in ERP
Enter actual setup time, run time, scrap quantity, and rework quantity against the WO. Variance vs. standard cost is reviewed by the production manager at end-of-shift; persistent variances feed the next kaizen target.
-
Brief the next shift at handover
Update the shift log with WO status, partial completions, open NCRs, and any tooling or gauge issues encountered. Walk the incoming shift lead through the cell so in-process WOs continue without restart loss.
Use this template
Copy it to your account, customize the steps, and run it with your team in minutes.
Browse hundreds of free templates across every team and industry.
Back to template libraryRun Production Line Quality Control Checklist with your team
Customize the steps, assign roles, set a schedule, and keep a complete record for every run.