Start using this Workflow
Temperature-Controlled Cargo Checklist
Pre-Transportation Preparation
Ensure that the temperature control unit is functioning correctly and set to the appropriate temperature for the cargo.
Check the insulation of the cargo area to prevent temperature fluctuations during transit.
Verify that all necessary temperature monitoring devices are in place and operational.
Loading Process
Load the cargo in a manner that allows for adequate air circulation around the packages.
Confirm that the cargo is properly secured to prevent shifting during transportation.
Record the initial temperature of the cargo before sealing the transport unit.
During Transit
Monitor temperature readings regularly and document any significant changes.
Check the external weather conditions and adjust the temperature control settings if necessary.
Ensure that the vehicle remains fueled and the refrigeration unit has a constant power supply.
Delivery and Unloading
Verify the final temperature of the cargo upon arrival at the destination before unloading.
Handle the cargo carefully during unloading to maintain the integrity of the temperature-controlled environment.
Provide the receiver with all necessary temperature logs and documentation for the shipment.
Post-Delivery
Inspect the transportation unit for any damages or malfunctions after the cargo is unloaded.
Clean the cargo area to prepare for the next load, ensuring it is free from debris and contaminants.
Review the temperature records and other documentation to identify any issues for future improvements.